- Completed the installation of the six breaker GIS arrangement at the second-floor elevation.
- Installation of the GIS equipment, raceway from equipment to LCC’s, grounding, and gas piping.
- This project presented a unique logistical challenge as we had to rig all equipment to the second floor through a small space.
Market(s): Substation / Transmission