Building a Brighter Future
Connect With Us:
Building a Brighter Future
Connect With Us:

Bucksport, Maine: 115kV EPR Feeder Installation

Location:Bucksport, ME
Owner:Bucksport Generation LLC
Client:Kerite Cable
Status:Completed October 2018
  • Installation 3 x 1500 Kcmil 115kV SPS 100% 800mil insulation cable that was pulled in three 6″ existing conduits in continuous duct bank.

Market(s): High & Extra-High Voltage Cable