- Installation of new 345kV GIS breakers located within the protected area of the Seabrook Nuclear Power Plant.
- Installation of 3,500 feet of three outgoing 345kV GIB transmission lines that tie into the existing 345kV Air Insulated Substation (AIS).
- Additional upgrades to the AIS, GIS, and GIB structures to accommodate the new equipment
- Developed and implemented 42 rigging plans, resulting in over 700 successful rigging picks.
Market(s): Power Generation / Substation / Transmission