- Installation of an extension to the existing station including a 7 – Breaker 345kV Gas Insulated Ring Station and approximately 3600 Circuit Feet of both 115kV and 345kV GIB and miscellaneous substation upgrades for Eversource.
- Replacement of the brown glass at Eversource Station 211
Market(s): Substation / Transmission