Building a Brighter Future
Connect With Us:
Building a Brighter Future
Connect With Us:

Flatiron - Chelsea Energizar 250MW BESS - Substation & Gen-Tie

Location:Chelsea, MA
Owner:Flatiron Energy
Client:Consigli Construction
Status:Ongoing
  • Electrical construction and installation of the electrical substation and high-voltage generator-tie (Gen-Tie) infrastructure supporting the 250 MW Chelsea Energizar Battery Energy Storage System (BESS)

Market(s): BESS & Renewable Energy / Design-Assist / Power Generation / Substation / Transmission