Building a Brighter Future
Connect With Us:
Building a Brighter Future
Connect With Us:

NH Electric Co-Op - Cable TV Make-Ready Distribution Line

Location:Alton, NH
Client:NH Electric Co-Op
Status:Completed June 2026
  • Installation of 135 new poles ranging from 35’-50’ to set and 321 new anchors. Transfer all NHEC facilities to the new pole locations. Including but not limited to all overhead conductors, transformers, primary and secondary URD cables, and service equipment.

Market(s): Distribution