The TRACK at New Balance - BESS and Solar

Location:Boston, MA
Owner:New Balance Development
Client:John Moriarty & Associates
Status:Completed 2023
  • Installation of the first approved Battery Energy Storage System (BESS) in Boston. Two paralleled Samsung BESS units, with a combined storage capacity of 556kW, and 100 battery modules.
  • Installation of a 1MW solary array sytem with 2,500 panels and a two mile rail system.
  • Safety Focus: The fire suppression system was upgraded to a Novec gas system to mitigate
    potential hazards in the event of a battery fire. A custom deluge system was installed to handle battery fires and thermal runaway, providing additional safety measures.

Market(s): BESS & Renewable Energy / Power Generation